RM150 mil to upgrade Shah Alam main drainage system: MBSA

14 Apr 2022 • 8:12 PM MYT
The Vibes
The Vibes

Featuring breaking news & latest stories from every side.

image is not available
RM150 mil to upgrade Shah Alam main drainage system: MBSA

SHAH ALAM – The Shah Alam City Council (MBSA) has allocated RM150 million to upgrade the main drainage system and retention ponds in the township which will be implemented over the next three years, to address flood issues.

Shah Alam Mayor Datuk Zamani Ahmad Mansor said for the first year, RM50 million would be used to upgrade the drainage system and retention ponds in flood-prone areas.

“This year, we will first focus on areas such as Taman Sri Muda, Section 13, Taman Mesra, and Taman Tun Dr Ismail Jaya,” he told a press conference after officiating the town hall session for the preparation of the Shah Alam Flood Action Plan for 2022-2024 here today.

Zamani Ahmad said a 50-year average recurrence interval (ARI) design was needed for Shah Alam as the current drainage system can only accommodate between five and 20 ARIs and it was no longer suitable due to rainfall uncertainties.

On the preparation of the Shah Alam Flood Action Plan, he said MBSA planned to build structures that can help control unusual flood situations and support the existing flood mitigation system provided by the Irrigation and Drainage Department. – Bernama, April 14, 2022