BREAKING NEWS NO. 1: LRT-1 on limited operations following technical fault in Carriedo

16 Apr 2026 • 11:03 AM MYT
The Manila Times
The Manila Times

One of the longest-running English broadsheets in the Philippines

image is not available

Operations of the Land Rail Transit Line 1 (LRT-1) are on limited problems, following technical problems at the Carriedo Station in Manila on Thursday.

In an advisory on its Facebook page, the LRT-1 is running only from Dr. Santos Station to Baclaran Station (and vice versa) and from Fernando Poe Jr. Station to Central Terminal (and vice versa).

“Our Engineering Team is on-site working to resolve the fault,” the LRT-1’s advisory read.

“We sincerely apologize for the inconvenience and appreciate your understanding as we work to fully restore operations,” it added.

Newswav Malaysia Best News App

Newswav is an online content aggregator and obtains its content from different online sources. The content in the app do not belong to Newswav nor do they reflect the opinions of Newswav and its staff. Your use of this app indicates your understanding and acceptance of this information.

Newswav Sdn. Bhd. (201701008480 (1222645-M)) 2026 All Rights Reserved