KLIA roof leaks during heavy rain, check-in counters temporarily closed

LocalEnvironment
14 Nov 2025 • 9:15 PM MYT
The Sun Daily
The Sun Daily

For the latest news and features from Malaysia and the rest of the world.

image is not available

KLIA check-in counters K and L closed for 90 minutes after roof leaks during heavy rainfall, with core airport functions remaining operational

KUALA LUMPUR: Malaysia Airports Holdings Berhad (MAHB) reported roof leakages at Kuala Lumpur International Airport (KLIA) following exceptionally heavy rainfall today.

The incident began at 4.14 pm, coinciding with an Aerodrome Warning issued by the Malaysian Meteorological Department.

Check-in counters K and L were affected by the water leakage but reopened within one-and-a-half hours after clearance and safety checks.

MAHB confirmed core airport functions including passenger processing, terminal movement and key systems remained unaffected.

The Aerotrain and baggage handling system continued normal operations throughout the incident.

Technical checks are ongoing while some support functions remain under close monitoring.

READ MORE: KLIA Terminal 1 suffers water leakages during heavy storm

MAHB will conduct a technical assessment to determine the root cause of the leakages.

The investigation will examine contributing factors from today’s extreme weather conditions.

Necessary corrective and preventive measures will be implemented to strengthen KLIA’s resilience against similar future events. – Bernama

Newswav Malaysia Best News App

Newswav is an online content aggregator and obtains its content from different online sources. The content in the app do not belong to Newswav nor do they reflect the opinions of Newswav and its staff. Your use of this app indicates your understanding and acceptance of this information.

Newswav Sdn. Bhd. (201701008480 (1222645-M)) 2026 All Rights Reserved