Road restoration underway after landslides disrupt connectivity in Arunachal's Keyi Panyor

Environment
25 Jun 2026 • 11:57 PM MYT
ANI
ANI

India's largest TV news agency and newswire service, covering news and controversy.

Image from: Road restoration underway after landslides disrupt connectivity in Arunachal's Keyi Panyor

Keyi Panyor (Arunachal Pradesh) [India], June 25 (ANI): Road clearance and restoration operations are underway in Arunachal Pradesh's Keyi Panyor district after landslides, flooding and road washouts caused extensive damage along the Potin-Possa stretch, with authorities reporting eight major road blockages and continued disruption to traffic movement.

According to a situation update issued by the Superintendent of Police, Keyi Panyor, the Potin-Lichi and Possa-Potin stretches have been rendered completely impassable due to severe damage at multiple locations. Authorities said restoration is expected to take several days, and no definitive timeline can currently be provided for the resumption of safe traffic movement.

Two Poclain excavators have been deployed from the Pitapool side to facilitate road clearance operations up to Potin. Trailer trucks have also been arranged from Kra Daadi and Kamle districts, while the excavators have been mobilised locally.

The Border Roads Organisation (BRO) is continuing road clearance operations from the Kimin side. Heavy machinery has been deployed for restoration work, though officials said normal vehicular movement is likely to take an additional three to four days to resume.

Authorities have also intensified search and rescue efforts for four missing persons. Additional personnel from the State Disaster Response Force (SDRF) and district police have been deployed for the operation.

In a medical evacuation, a critically ill patient was airlifted from Ziro by helicopter. The mortal remains of Nirmala Gupta were transported from Pitapool Ground by the Indian Air Force (IAF), according to the update.

Officials said restoration of the water supply system is in progress. With support from residents, the water supply to the Higher Secondary School has been temporarily restored.

The administration further stated that temporary restoration of essential connectivity and services in the New Pitapool area is expected by Thursday evening. (ANI)

Newswav Malaysia Best News App

Newswav is an online content aggregator and obtains its content from different online sources. The content in the app do not belong to Newswav nor do they reflect the opinions of Newswav and its staff. Your use of this app indicates your understanding and acceptance of this information.

Newswav Sdn. Bhd. (201701008480 (1222645-M)) 2026 All Rights Reserved