Selangor allocates RM36.45 million for 47 flood mitigation projects

LocalEnvironment
13 Nov 2026 • 6:45 PM MYT
The Sun Daily
The Sun Daily

For the latest news and features from Malaysia and the rest of the world.

Image from: Selangor allocates RM36.45 million for 47 flood mitigation projects

Of the 47 flood projects, 30 are continuation works and 17 are new, with RM9.15 million for Sungai Klang basin and RM7.35 million for Sungai Langat.

SHAH ALAM: The Selangor government has allocated RM36.45 million for 47 immediate flood mitigation projects under the Department of Irrigation and Drainage (JPS) for 2027.

Menteri Besar Datuk Seri Amirudin Shari, when tabling the state’s Budget 2027, said that of the total, RM9.15 million would be for the Sungai Klang basin and RM7.35 million for the development of the Sungai Langat basin.

He said the allocation would also cover the Sungai Buloh, Sungai Selangor, Sungai Bernam and Sungai Kapar Besar river basins, as well as preparatory works such as design, surveying and land matters.

He added that, of the 47 projects, 30 are continuation projects, of which 13 have been completed and are undergoing final account preparation, nine are being implemented, two are at the pre-tender stage while six are at the design stage.

“As for the 17 new projects, one is at the design stage, 11 are in the process of appointing consultants and five are still at the planning stage,” he said at the Selangor State Legislative Assembly sitting today.

Amirudin also said that RM19.38 million had been allocated for 25 irrigation system projects, RM17.90 million for 16 river basin development and management projects, and RM6.63 million for nine environmentally friendly irrigation projects.

For flood mitigation projects under the Selangor Maritime Gateway Economic Development Zone (SMG ZPE), RM25 million has been proposed to continue works to increase river capacity and improve water flow, with the projects having achieved 71.43 per cent physical progress.

While physical works are underway, Amirudin said the disaster warning system between the state and district operation centres and agencies on the ground would also be improved.

“Through the Community-Based Disaster Risk Management Programme and training in schools, we want residents to know where they need to go, who to contact and how to assist those who need support to evacuate,” he added.

Amirudin also wants the Public Works Department (JKR), local authorities (PBTs) and the JPS to prioritise projects that resolves flooding problems, including culverts and drainage systems.

“Technical reviews that can be conducted concurrently should be initiated simultaneously. If a decision involves multiple agencies, the matter must be brought to the relevant authorities who can resolve it at an earlier stage.

“The Netherlands’ experience offers us a guide on what needs to be accelerated and one of the initiatives is the integration of embankments and water control structures with planning that allows rivers to overflow more safely,” he added.

Meanwhile, he said the state government would provide a public dashboard displaying project locations, implementing agencies and updates on implementation phases, from the appointment of design consultants and contractors to the progress of on-site works.

“Before the monsoon season begins, the government will update the status of flood-prone locations, detailing the related projects, appointments that have been made and works expected to be completed in time.

“With this information, residents can know the level of protection in their areas ahead of the rainy season and refer directly to the agencies responsible,” he said.

Newswav Malaysia Best News App

Newswav is an online content aggregator and obtains its content from different online sources. The content in the app do not belong to Newswav nor do they reflect the opinions of Newswav and its staff. Your use of this app indicates your understanding and acceptance of this information.

Newswav Sdn. Bhd. (201701008480 (1222645-M)) 2026 All Rights Reserved