Installing an EV charger at home sounds simple enough.Buy a wallbox, arrange an installer and you're good to go.Right?
Well, not necessarily in Selayang. An officialMajlis Perbandaran Selayang (MPS)checklist outlines a permit process involving aPrincipal Submitting Person (PSP), building plansand supporting documents. And yes,the council's own example involves justone AC charger at a two-storey terrace house.
MPS's official document includes an application example for installing a single AC EV charger at a two-storey terrace house. Source: MPS. MPS's JB-B11 checklist, updated on 28 April 2026, outlines a small-workspermit procedure for AC electric vehicle chargingbays (EVCB). Its residential example confirmsthat landed-home installations are contemplatedunder the published application process.
However, the document does not establish whetherevery private home wallbox installationrequires approval without exceptions.
What Documents Do Homeowners Need?
The MPS application checklist requires submission through a registered Principal Submitting Person (PSP), alongside the relevant application forms and supporting documents. Source: MPS. Here's where the paperwork gets interesting.MPS's checklist calls for submission by aregistered PSP, who may be anappropriately registered architect or engineer,supported by building plans, property recordsand technical documents.
WHAT THE MPS CHECKLIST INCLUDES ✓ Application & Plans PSP application letter, completed Form A and A3 building plans. ✓ Property & Owner Records Ownership documents, relevant land records, land and assessment tax receipts, identification and CFO, CCC or Form F documentation. ✓ Site & Technical Documents Recent PSP-certified site photographs, a TNB or licensed distribution utility letter and a PSP-certified Self Compliance Declaration. ✓ Additional Documents, Where Applicable Management body or developer consent, highway-related approval and other conditional supporting records.The exact documents needed may depend on the propertyand installation circumstances. Notably, sitephotographs must be no more thanseven days old when submitted.
The official MPS checklist specifies a RM100 processing fee and RM5 permit sticker charge, bringing the published council charges to RM105. Source: MPS. According to the official MPS checklist,the published charges for this particularapplication procedure are:
PUBLISHED MPS JB-B11 CHARGES RM105 Application processing RM100 Permit sticker RM5 Important: These are the charges listed in MPS's JB-B11 checklist. They exclude charger hardware, electrical installation, PSP services and potential electrical upgrades. Other applicable charges should be confirmed with the council.The checklist requires PSP involvement but doesnot specify professional fees. SoRM105 is not the total cost of installinga home EV charger.
Council permit charges may also differ betweenlocal authorities and application types.The RM105 figure should therefore not betreated as a nationwide permit rate.
While the published MPS charges total just RM105,the overall cost of installing a home EV chargercould be considerably higher once installationand professional submission services are factored in.
According to cost estimates shared with Carz,a 10-metre EV charger installation could costbetween RM1,500 and RM1,900. Meanwhile,appointing a Principal Submitting Person (PSP)to handle the application process from start to finishis estimated to cost RM12,000 to RM20,000,with RM12,000 quoted as the starting fee.
Based on these figures, here's how the potentialcosts could add up:
INDICATIVE COST ESTIMATES EV charger installation Based on a 10-metre installation RM1,500 - RM1,900 PSP appointment and submission assistance Estimated professional service fee, with RM12,000 as the quoted starting figure RM12,000 - RM20,000 Published MPS JB-B11 charges RM100 processing + RM5 sticker RM105 Illustrative Total RM13,605 - RM22,005 Note: The installation and PSP figures are indicative estimates, not independently verified standard residential rates. The total excludes the charger itself and any additional applicable costs.Importantly, the estimated PSP fee is nota council-imposed charge. It coversprofessional assistance with the submission process,while the RM105 figure is taken directly fromMPS's published checklist.
Actual expenses will depend on the property,installation requirements and scope of professionalservices. Homeowners should obtain quotationsand confirm the applicable requirements with MPSbefore proceeding.
What About EV Charger Safety Requirements?MPS's checklist covers charging bay placement,fire safety and electrical isolation. Some provisionsare specifically marked for public-use ornon-residential installations, while theapplicability of others to private homesremains unclear.
Separately,Suruhanjaya Tenaga's EVCS guidelinesaddress electrical safety and installation.These are distinct from MPS's building-permitprocess.
What Should Selayang Homeowners Do Before Installing A Charger?Before arranging a home EV charger installationwithin MPS's jurisdiction, homeowners shouldconfirm whether the JB-B11 procedure appliesto their property, which documents are requiredand whether PSP services will be necessary.
Given the potentially significant differencebetween the published council charges andquoted professional service costs, homeownersshould also request a clear breakdown ofany proposed fees before committing toan installation.
Checking directly with MPS and the relevantprofessionals beforehand could help avoidunexpected costs or complications.
RELATED READ ST: 'Free' Public EV Charging Requires EVCS Licence How To Buy Your First Electric Car Without Regrets: A Complete First-Timer's Guide Frequently Asked Questions (FAQ) Does Selayang's EV charger permit cover landed homes?The published MPS procedure includes an application example involving one AC charger at a two-storey terrace house. However, the checklist does not establish that every private residential installation requires approval without exceptions.
How much is the official MPS EV charger permit fee?The published JB-B11 checklist lists RM105 in council charges, comprising RM100 for application processing and RM5 for a permit sticker. This does not include installation, PSP services or other potentially applicable costs.
Could a home EV charger installation cost over RM20,000?Based on the cost estimates supplied to Carz, a 10-metre installation and PSP services, combined with the published MPS charges, could produce an illustrative total of RM13,605 to RM22,005, excluding the charger itself. However, the installation and PSP figures have not been independently verified as standard residential rates. Homeowners should obtain quotations for their specific circumstances.
Do I need an architect or engineer to submit the application?The MPS checklist calls for a Principal Submitting Person (PSP) registered with the Board of Architects Malaysia or Board of Engineers Malaysia. Homeowners should confirm the applicable submission arrangements with MPS.