
KUALA LUMPUR – The SMART Tunnel has been completely closed to users in preparation for flood operations following heavy rain since this evening.
SMART, via a post on Twitter, said that the closure was implemented after receiving instructions from the Irrigation and Drainage Department at 7.13pm today.
“Mode 3 has been activated. In this mode, the tunnel is closed to traffic by the SMART Traffic Control Centre and floodwaters are still being diverted,” according to the post.
The status of the Smart Tunnel can be followed through the SMART website at www.smarttunnel.com.my, Twitter on @smarttunnel, or ‘Smart Tunnel’ on Facebook.
For more information and queries, contact the SMART helpline at 1300887188. – Bernama, December 10, 2022
.png)