Solar-powered lights for Orang Asli village in Gua Musang to be installed under 13MP project

LocalPolitics
3 Mar 2025 • 9:04 AM MYT
Daily Express
Daily Express

Daily Express Online (Malaysia) is Sabah's top-ranked & most viewed English news site. It is also Sabah's leading & most circulated daily English newspaper.

image is not available

By: Bernama

KOTA BHARU: The installation of solar-powered lights in Kampung Sempadik, Pos Belatim, Gua Musang has been included under the Rural Electricity Supply (BELB) Alternative Project, which will provide a hybrid solar system for villages still without grid electricity.

The Department of Orang Asli Development (JAKOA), in a statement said the initiative reflects its commitment to improving the welfare and well-being of the Orang Asli community, especially those living in remote areas.

Advertisement (adsbygoogle = window.adsbygoogle || []).push({});Following recent media reports, JAKOA said the project application was submitted under the First Rolling Plan (RP1) of the 13th Malaysia Plan (13MP and is expected to be implemented in 2026.

“As an interim measure, JAKOA is working with relevant agencies and NGOs to identify locations in need of temporary solar-powered lights to provide basic lighting before the project’s full implementation,” the statement read.

SPONSORED CONTENT How Spritzer’s silica rich natural mineral water makes your skin healthier When it comes to skincare, the first thought on our minds would be beauty products such as serums, creams, and masks. However, beauty experts and even researchers have stated that drinking more water can be just as crucial for your skin's health. Read more The initiative aims to ensure affected villages can benefit from basic lighting while awaiting long-term solutions.

JAKOA reaffirmed its commitment to enhancing the quality of life of the Orang Asli community and ensuring their welfare remains a priority.