Tesla’s energy storage push: Shanghai megafactory to complete construction by end of year

WorldTechnology
25 Dec 2024 • 7:39 PM MYT
Malay Mail
Malay Mail

Latest Malaysia breaking stories on politics, analysis and opinions

image is not available

SHANGHAI, Dec 25 — US carmaker Tesla’s mega factory in Shanghai is expected to finish construction by the end of this year, according to Tesla China, reported Xinhua.

The factory, which broke ground in late May, will be dedicated to manufacturing the company’s energy-storage batteries, Megapack.

Mass production is planned for the first quarter of 2025, with an initial output of 10,000 units annually, equal to around 40 GWh of energy storage.

Covering an area of approximately 200,000 square metres, the new plant represents a total investment of around 1.45 billion yuan (about RM905 million), according to the administration of Lin-gang Special Area of China (Shanghai) Pilot Free Trade Zone.

The mega factory is the first of its kind built by Tesla outside the United States and the company’s second plant in Shanghai, following the inauguration of its gigafactory in 2019. — Bernama/Xinhua

Newswav Malaysia Best News App

Newswav is an online content aggregator and obtains its content from different online sources. The content in the app do not belong to Newswav nor do they reflect the opinions of Newswav and its staff. Your use of this app indicates your understanding and acceptance of this information.

Newswav Sdn. Bhd. (201701008480 (1222645-M)) 2026 All Rights Reserved