Traffic Diversion On Bukit Gambir-Tangkak From Aug 5

LocalCars
4 Aug 2025 • 2:15 PM MYT
Carz Automedia
Carz Automedia

Latest automotive news & review in one place.

image is not available

image is not available Drivers travelling along the North-South Expressway near Tangkak can expect traffic diversions starting August 5, as construction kicks off on a new bridge.

The affected stretch spans KM166.79 to KM168.26 between the Bukit Gambir and Tangkak Elevated Interchange, and the diversion will be activated in both directions.

The works are expected to continue until December 30.

PLUS Malaysia Berhad (PLUS) confirmed that the diversions will be introduced in stages to make way for bridge construction works carried out by contractors from the Public Works Department (JKR).

“Highway users are encouraged to plan their routes ahead and follow all traffic signs and directions from on-site personnel,” PLUS said in a statement on Sunday.

Real-time traffic updates will be available through the PLUS mobile app, the PUTRI Virtual Assistant, the @plustrafik account on X, and electronic message boards (VMS) along the highway. image is not available For urgent help or emergencies, motorists can also call PLUSLine at 1800-88-0000.

PLUS is reminding drivers to stay alert in the area throughout the construction period and to be patient as the work progresses.

Newswav Malaysia Best News App

Newswav is an online content aggregator and obtains its content from different online sources. The content in the app do not belong to Newswav nor do they reflect the opinions of Newswav and its staff. Your use of this app indicates your understanding and acceptance of this information.

Newswav Sdn. Bhd. (201701008480 (1222645-M)) 2026 All Rights Reserved