Tuaran river gets RM16 million makeover

14 Nov 2026 • 1:06 PM MYT
Daily Express
Daily Express

Daily Express Online (Malaysia) is Sabah's top-ranked & most viewed English news site. It is also Sabah's leading & most circulated daily English newspaper.

Tuaran river gets RM16 million makeover

Tuaran: A RM16.47 million river conservation project in Tuaran has strengthened the riverbank and added recreational facilities for residents, said Sabah Drainage and Irrigation Department (DID) Director Siraja Bashora.

He said the project, which began on Nov 13, 2023, was fully completed on June 7, 2026 at a total cost of RM16.47 million.

Siraja said this at the launch of the Sungai Tuaran Conservation Project and the new Pekan Tuaran car park.

The main works include 900 metres of riverbank defence built with the armour rock method, a 900-metre riverside walkway, river channelling works, a new bridge and landscaping.

“The project was originally based on the technical need to protect the riverbank, but it has been given a wider development dimension, with the potential to become part of the identity and pride of Pekan Tuaran.

Siraja said this when speaking on the project’s aim of combining river management needs with public facilities to improve residents’ quality of life.

“Despite limited resources and various implementation challenges, DID Sabah is still able to turn plans into real development results. We do not use limited resources as an excuse to stop trying. Instead, we use it as motivation to keep finding ways, set priorities and ensure the trust given to us is carried out.”He said the project showed the Department could deliver despite manpower, technical resources, and funding constraints.

Siraja acknowledged that many development needs still require attention, especially flood mitigation and drainage infrastructure across Sabah.

He said DID Sabah would continue to act according to its priorities and available resources.

On maintenance, he said river conservation should not stop once a project is completed, it needs continuous management, monitoring, and upkeep. The DID Sabah will maintain the project area according to needs and approved allocations.

Siraja also urged Tuaran residents to help keep the area clean, safe and attractive so the facilities can be enjoyed over the long term.

Newswav Malaysia Best News App

Newswav is an online content aggregator and obtains its content from different online sources. The content in the app do not belong to Newswav nor do they reflect the opinions of Newswav and its staff. Your use of this app indicates your understanding and acceptance of this information.

Newswav Sdn. Bhd. (201701008480 (1222645-M)) 2026 All Rights Reserved